Check out the exam schedule page, up near the homework page.
Here’s what we went over in today’s last Building Science class:
BUILDING SCIENCE
Bring all notes, assignments, unit conversion charts, building science tables (SpV, Air, Water, on learn) ASHRAE Standard 62.1,
Learn:
- Building Science tables
- ASHRAE 62.1 page (11-14, 18) under assign 10
- ASHRAE Fundamentals Ch. 26
- Conversion Charts
Sun Angle formulas
SHF = HS/HT = HS/(HS+HL)
Type 1 VB = 0.1 perm or less
@100% RH = WB = DB = DP
@0% RH = W (specific humidity) = 0 gr/lb
Pabs = Pg + Patm
Here’s some notes I took in Project Admin yesterday.
IĀ apologizeĀ that I didn’t get all of the answers, Jerry was going supa fast.
Here are some (unorganized) notes that Rick mentioned at some point in class:
teams of 2, measure this new area
metric
come up with a design
drawings are individual
AUTOCADdemo plan: existing
Legend:
line = wall
hidden line = existing to be demo
existing doors dont arc.. pointy
new walls need hatch pattern
1:100
dont show door thickness?notes:
entirely remove ceiling
existing flooring shall remainW1:
16 GWB
92 Steel Studs
@400 O/C
F.G. Sound Insul.
16 GWB
Floor to U/S CLGno furniture on the construction plan ONLY RECEPTION DESK
dont dimension door location or size
new floor = sheet vinyl
waiting room = sheet floor or carpet11×17 metric
1:100 side-by-side w legendinside walls 120mm